Embankment construction method - Tail Arm method
Embankment construction method - Tail Arm Method
This is an embankment construction method that reinforces the soil, which lacks the necessary self-supporting strength, using strip-shaped reinforcing materials made of "steel," a material with low deformation and high tensile strength, to build a reinforced embankment with wall surfaces. ◆ Strip-shaped steel reinforcing materials (strips) are laid in layers within the embankment. ◆ A strong reinforced embankment is constructed through the friction effect between the soil and the strips. (For other functions and details, please contact us.)
- Company:JFE商事テールワン
- Price:Other